Going Forward
GOING FORWARD Lost count of the number of days. What can I say: busy finishing working at Oromocto, vacation at the cottage for my 65th Birthday Bash, final packing for the Big Move and the finalizing of the sale of the Oromocto house. And for the past week, been busy trying to get things set up and organized in the camper at the same time as operating the AirBNB, while dragging my butt in the heat and dealing with a summer cold. Trying to get back on track with the blog now that Terry has finally been able to start his part of the build. Slow process as I have to get photos from our phones onto the laptop to upload to the blog. So, sometimes photos may get added later. Once the cement exterior walls were up for the basement, the plumber arrived to do the rough-ins for the basement bathroom as well as sump pump and septic system. Everything passed inspections. Guess the internet speeds up the process: when Terry called the various trades to aler...